cancel
 

 

Job type :

Zip Code :

community forums

Featuring over 100 topics of interest to DoItYourselfers.
Close Help

Help FAQ


Creating a Project:

  • Just go here and follow the simple instructions.

Updating/Modifying a Project:

  • You have a bunch of editing options available on your project page.
  • Just look for the edit icons. Edit Icon Click on them to change some text or swap out an image.

Uploading/Changing Photos:

  • You can Upload your own photos to to your project page. Images will be scaled down to 550x500 pixels.
  • Click change photo next to an image to swap it out for a new one.
  • Click remove photo next to an image to permanently delete that photo from your page.
  • Click Add a Photo add extra photos to your project page.

Reporting Inappropriate Content:

  • Click Flag as inappropriate and an email will be sent to our editing staff who will review the page immediately.
  • Just click report this next to a comment to let our editors know a review is needed.
Close Helpclose Help

Bedroom Decoration

Flag as inappropriate
  • Currently2.97/5 Stars
  • 1
  • 2
  • 3
  • 4
  • 5
out of 336 votes
Created: Feb 09, 2009 by Measure twice
Views: 2925

comments


Before

Before Photo

After

After Photo

Project Summary

This bedroom was last decorated in the 1970's and is need of a full makeover.

The room includes a sink, fitted-wardobes, headboard and drawers.

- The sink unit and plumbing will be removed and wall repaired
- Fitted wardrobes to be removed and wall repaired
Fitted headboard and drawers to be removed
- Carpet and wallpaper & ceiling paper to be removed.
- Exisiting electric sockets updated to new standards and new sockets installed
- Damp area under window to be ripped out and replatered with new skirting
- Radiator to be relocated to opposite/internal wall

The room will be re-papered and painted, woodwork sanded and painted and a new carpet fitted, new curtains and furnishing.

Project Journal

Image for Day 1

Day 1

- removed the fitted wardrobes

Day 2

- Removed the sink unit, capped the pipes above the floor and removed the waste pipe.

Day 3

- Removed all wall and ceiling paper.

Day 4

- Removed carpet
- Moved existing sockets
- Installed new socket & coaxial aerial
- Installed new light switch and pendant
- Repaired damaged walls
- Sanded all wood

Day 6

- Wallpapered the walls

member comments

or Register to leave a comment.

If you have a question you would like answered, please visit our Community Forums.

Tags for this project

Budget & Materials

Budget:
$1600
Materials:
  • Plaster
  • Wallpaper
  • Paint
  • Filler
  • Carpet
  • Radiator / copper pipe / thermostatic valve
  • Electrical sockets and wire

More Photos