5x8 bathroom Tore out the walls and the ceramic tile floor. Replaced everything except the tub.
Replaced inward swinging door with pocket door, it was challenging to accomplish this without disturbing the drywall in the hallway. We had a knockdown texture on it and really didn't want to repair the wall. Having little framing support on the bathroom side at the foot of the tub (because of the pocket door) was overcome by hanging the cement from the ceiling to floor in one sheet. We have done all this work ourselves
Building and installing a linen closet and vanity soon