cancel
 

 

Job type :

Zip Code :

community forums

Featuring over 100 topics of interest to DoItYourselfers.
Close Help

Help FAQ


Creating a Project:

  • Just go here and follow the simple instructions.

Updating/Modifying a Project:

  • You have a bunch of editing options available on your project page.
  • Just look for the edit icons. Edit Icon Click on them to change some text or swap out an image.

Uploading/Changing Photos:

  • You can Upload your own photos to to your project page. Images will be scaled down to 550x500 pixels.
  • Click change photo next to an image to swap it out for a new one.
  • Click remove photo next to an image to permanently delete that photo from your page.
  • Click Add a Photo add extra photos to your project page.

Reporting Inappropriate Content:

  • Click Flag as inappropriate and an email will be sent to our editing staff who will review the page immediately.
  • Just click report this next to a comment to let our editors know a review is needed.
Close Helpclose Help

CHANGING BATHROOM TO BEDROOM


  • Currently2.97/5 Stars
  • 1
  • 2
  • 3
  • 4
  • 5
out of 255 votes
Flag as inappropriate
Created: Feb 09, 2009 by Measure twice
Views: 1330




Before

Before Photo

After

After Photo


More Photos

Alternate Photo 1Alternate Photo 2Alternate Photo 3

Project Summary

Budget:
$1000
Materials:
  • Plasterboard
  • Plaster
  • Electric sockets and light fitting
  • Skirting boards
  • Floor sander
  • Hand-held belt sander
  • Wood filler
  • Light stain & floor varnish
  • Wallpaper/paint
Following the 'Total Bathroom Refit' (see my project page), I am continuing the renovation. Previously the bathroom was two rooms connected by an archway. The archway was closed and the bathroom refitted.

The remaining side of the bathroom will now be developed into a home/office or bedroom.

The room currently has a shower cubicle, beday, towel radiator. These items will be removed along with the tiled walls and carpet.

- The exposed wall and archway and ceiling will be boarded and plastered.
- Piping including waste pipes to be removed.
- Air vent to be bricked/blocked.
- Skirting boards replaced
- Floor boards will be sanded and varnished.
- Electric sockets and new lighting to be installed (these will be signed off by a qualified electrician).

Project Journal

Image for Day 1

Day 1

- Removed the Beday and capped the pipes above the floor.
- Removed the shower unit and fully removed the pipes and pump.
- Removed some but not all of the wall tiles




member comments

or Register to leave a comment.

If you have a question you would like answered, please visit our Community Forums.

Did-it-myself Projects


updated by Measure twice
did this on 5/11/2009

Bedroom Decoration


updated by chainsawgrandma
did this on 3/04/2009

Empty Nest Bedroom Remodel


updated by Measure twice
did this on 2/10/2009

Changing Bathroom To Bedroom


Tags for this project