cancel

Find Qualified
Local Contractors

Select Service:
Enter Zip:

community forums

Featuring over 100 topics of interest to DoItYourselfers.
Email Page   Print Page

Flush Clip Mount Ceilings 5 - Installing and Squaring the Remaining Rows

comments
  • Currently3.08/5 Stars
  • 1
  • 2
  • 3
  • 4
  • 5
out of 651 votes


Flush Clip Mount Ceilings 5 - Installing and Squaring the Remaining Rows
Intro - Materials - Prep/Layout - Joists - Squaring Rows - Installing Tiles

Margin of Error: 1/2"

After this first row is in place, proceed with the second row. Remember, this row will be used to hold the odd-sized border row. When you install this second row of furring strips, do it so that they are placed a distance from the wall that is the size of the border tile less 2". In our example, where we have 10" border tiles, this second row would be placed 8" (10 - 2=8") from the wall.

Measure along as you go; be sure you keep a constant 8" from the wall. Nail this row up in the same manner as you did the row next to the wall. Be sure to stagger your joints. This means that the joints between two 4' sections of strips should not occur at the same place in two adjacent rows, but rather should be staggered. This assures that there will not be a series of joints in a row across the furring strip row that could cause a noticeable dip.

After the second row is installed, begin the remaining rows. These are all placed 12" apart. Again, the next to the last row should be at a distance from the wall equal to the size of a border tile less 2" (8", in our example). The last row should be 1" from the wall.

Squaring the Ceiling with Strings

Margin of Error: Exact

If your walls are meeting at true right angles so that the room is a perfect square or rectangle, you can omit this step. Unfortunately, in many homes, especially older ones, this is not the case. In these instances you must set up strings that are at true right angles and lay the tiles according to these strings. The strings will serve as guides for installing and cutting the border tiles. If you omit this step, the tile ceiling will look strange and out of line with the walls.

You will need to set up two strings that run at the level of the new ceiling and out from each wall the width of the border tiles at that wall. The strings are attached to nails temporarily driven into the walls. The two strings will intersect at a corner. The strings are placed in such a way so as to outline the edge of the two intersecting border rows. Let's say that one row is a 10" row and the intersecting row is 8".

Set up one line so that it is at the level of the ceiling and running 10" from the wall. Do the same with the intersecting string so that it is running 8" from the wall. Once these are in place, take a framing square and, holding it steady, see if the two strings are square. Remember, if they are just a little off square over the 2' arm of the square, the walls could be a few inches off over the distance of the wall. Be sure, therefore, that each line is running exactly along each arm of the square. If they are not, adjust one of the strings (preferably the one that outlines the border row that will be least noticeable from below) until the lines are exactly at right angles. You now have a square reference with which to start installing the tiles.


© 2006 DoItYourself.com

Intro - Materials - Prep/Layout - Joists - Squaring Rows - Installing Tiles

member comments

or Register to leave a comment

articles we like

EPA's Position on Radon

What the EPA says about reducing the risk of radon... read more

Choosing and Planting Your Woody Landscape Plants

Helpful tips to that will help you plan and plant the woody areas around your... read more

Top Five Places to Ring in the New Year

Top Five Places to Ring in the New YearLooking for great places to ring in the New Year? Hear are five unique choices... read more

sponsored articles of the day

diy centers

Research and explore a wealth of wisdom on these topics