cancel

Find Qualified
Local Contractors

Select Service:
Enter Zip:

community forums

Featuring over 100 topics of interest to DoItYourselfers.

Full Spread Vinyl Flooring 4 - Floor Preparation

comments
  • Currently3.07/5 Stars
  • 1
  • 2
  • 3
  • 4
  • 5
out of 712 votes


Full Spread Vinyl Flooring 4 - Floor Preparation
Intro - Materials - Prep - Floor Prep - Template - Cut - Install

Margin of Error: Floor should be level within 1/8”, with gaps no Larger than 1/4”.

Most Common Mistakes

  1. Not leveling the floor and/or applying an underlayment if needed.
  2. Not making the needed repairs before beginning the job.

 


Most Common Mistakes

  1. When estimating the amount of sheet vinyl, forgetting to account for pattern matching at a seam.
  2. Unrolling sheet vinyl too early, or waiting too long to lay it, thereby causing it to shrink before it is permanently laid in place.
  3. Neglecting to use flooring materials with the compatible adhesive and appropriate trowel at seams.
  4. If you are applying a seamed floor, not laying the smaller section first.

Flash Player You should get Adobe Flash Player so you can view our video.


When laying a new floor, you will need to remove all furniture and appliances from the room. Do not attempt to merely move furniture from one side of the room to the other because you will need space in which to maneuver. Also, the floor will need some time to set once it is installed. So move out anything that isn’t attached. Remove the shoe moldings, trim pieces, door thresholds, and floor grates carefully, using a pry bar and a scrap of wood for a leverage wedge so as not to mar the baseboard. This will enable you to fit the flooring right up to the baseboard. Any minor imperfections along the cut edge of the new flooring will be hidden underneath the molding when you replace it. Also, the underlying floors need to be smooth and free of grease, dirt and any irregularities. Clean the floor well.

A scrap of cardboard will support your handsaw so you can undercut the bottoms of the doorway moldings to allow for the flooring to slip underneath. Keep the saw blade flat against the cardboard when doing this. If your floor is level, dry, and structurally sound, with an even finish, you will need no other prep work than to sweep and vacuum thoroughly, then mop the floor with a mild cleaner. If the flooring will have a seam, the 6” strip of floor directly under the seam should be very clean and free from any wax or finish so the adhesive will have something to hold on to. Use a heavy-duty detergent or wax remover to clean this strip. If the floor is badly sloped or dipped, fill those areas in with leveling compound. Install an underlayment of 1/4”plywood. Plan the seam so they do not match those of the flooring underneath. Over an open joist system, first apply a layer of 3/4” tongue-and-groove plywood as a sub floor. Check local code for specific recommendations. Nail the underlayment with 6 penny ring shank nails every 4” to 6” around the edge and every 4” in the middle. Check local code on this requirement as well. Leave 1/4” gap at the baseboard and 1/16” between sheets to allow for expansion and contraction of the wood.


© 2006 DoItYourself.com

Intro - Materials - Prep - Floor Prep - Template - Cut - Install

member comments

or Register to leave a comment.

If you have a question you would like answered, please visit our Community Forums.

articles we like

Cleaning and Replacing Car Battery Terminals
A guide for vehicle owners to cleaning and replacing car battery terminals... read more

Laying Pavers for a Walkway
A step-by-step guide to installing brick pavers for a walkway, including designing the walkway, preparing... read more

Cruising 101: Tips for Planning a Memorable CruiseCruising 101: Tips for Planning a Memorable Cruise
Cruise vacations have become a popular way to see the world with new ships and... read more

sponsored articles of the day

diy centers

Research and explore a wealth of wisdom on these topics