How to Lay a New Floor With Congoleum Vinyl - Sub Floor Done
Video Transcript
My sub floor is in. And the sub floor took approximately four to five hours to do this room. This room is 26 feet going that to here and then 12 from here to there. So it is actually a pretty fair sized kitchen. He put patch in between all the groups as you can see so that it will be leveled. He has also put patch because this was a textured floor in there before. You can see that basically, it is done. And, when he did this with the floor, I never noticed that there is actually a pattern to this floor but you can actually see it here in the squares. And so everything is looking okay and he made it look so easy. And the guy literally put his - a knife ripped through his thumb which was pretty disgusting but anyway. So we are just waiting for the last piece to dry here and then we are ready to start laying our tile.
My sub floor is in. And the sub floor took approximately four to five hours to do this room. This room is 26 feet going that to here and then 12 from here to there. So it is actually a pretty fair sized kitchen. He put patch in between all...
click to read more