Conduit in the way!
#1

I would like to frame the perimeter my basement using 2X4's, two walls have conduit attached to the bottom of the above floor joist, right were I would need to attach the top plate. Is there a minimum requirement for attaching the top late to the joist or must all conduit be moved. There seems to be room for a block to be added between top plate and joist every two feet or so.
[This message has been edited by KiddDakota (edited November 19, 2000).]
[This message has been edited by KiddDakota (edited November 19, 2000).]