cement pour

so, I'm ready to pour the new floor after a 10inch dig and 6 inches of drainage rock applied. I've done this once before and was satisfied with the result and know I will be again. Not a pro job but very servicable. Let me know if I'm missing anything, The cement will be wheel barrowed in from a window to the 20x20 foot room and dumped, I figure 3 guys with wheel barrows should do it in 1 hr. I could be convince to hire a pump truck. once that is done we will level it off as best as we can. we'll be wading in the cement and I'll make up some push sticks(6foot 2x4 on a handle to help leveling. I will have the wall maked with a lazer level but we'll eye ball it from the wall. we'll let it set for a while, maybe an hr or 2 then put down brds to walk on and trowel from the furthest point out back to the door to push the stones down and the water up, once that is satisfactory were done. Am I missing anything, Any advice. The cement contractor seemed to think that our plan was solid.
 
  #2  
Old 02-20-04, 02:45 PM
I
Member
Join Date: Dec 2003
Location: Israel
Posts: 56
Upvotes: 0
Received 0 Upvotes on 0 Posts
looks ok plan. What about metal bars ?
 
 

Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description:
Your question will be posted in: