support poles in basement


  #1  
Old 05-09-01, 06:38 PM
Guest
Visiting Guest
Posts: n/a
Question

I have a ranch style house built in 1958. The basement has steel poles supporting the main structural beams in the basement's ceiling. The poles are welded to the support beams and appear to be laid into the concrete floor.


One beam, (Beam A) is 13 ft long and runs from the concrete foundation wall (Wall X) until it ends to allow headroom for the stairwell. Beam A has one support pole (Pole P) that is 10 feet from Wall X. Another beam (Beam B) then starts on the other side of the stairwell and runs across another 6 feet to the opposite concrete foundation wall (Wall Y). Beam B is supported by a support pole (Pole Q) at it's start - 6 feet from Wall Y.

I would like to move Pole P over another 3 feet to the end of Beam A, 13 ft from Wall X to make room for some remodelling.

Any suggestions, warnings, etc. regarding how to move/replace Pole P? Is it best to put in a new permanent pole at the end of Beam A first, then remove Pole P. Or should I try some temporary support and actually move Pole P? Are there any safe workarounds instead of breaking up the concrete floor and then repouring concrete around a new pole? What about the welding between the new pole and Beam A?

Is this a bad idea in general to be moving support poles? Do I need to contact a structural engineer?
 
  #2  
Old 05-10-01, 07:33 AM
Guest
Visiting Guest
Posts: n/a
Exclamation STOP!!!

Don't touch that dial!!!


Any suggestions, warnings, etc. regarding how to move/replace Pole P? If you were to do this incorrectly, your house would implode.

Is it best to put in a new permanent pole at the end of Beam A first, then remove Pole P. Or should I try some temporary support and actually move Pole P? I would not move anything until I had the entire plan in front of me.

Are there any safe workarounds instead of breaking up the concrete floor and then repouring concrete around a new pole? Lolly poles (adjustable) can be used.

What about the welding between the new pole and Beam A? Cut the pole and then grind the old weld.

Is this a bad idea in general to be moving support poles? YES, it is a bad idea.

Do I need to contact a structural engineer? YES, by all means!


 
  #3  
Old 05-10-01, 09:42 AM
Guest
Visiting Guest
Posts: n/a
Thanks for the advice. I think I'll find a way to remodel without moving the pole. Doesn't seem worth the trouble/risk.
 
 