Inground Pool Concrete Patio


  #1  
Old 09-10-08, 07:30 PM
L
Member
Thread Starter
Join Date: Sep 2008
Posts: 7
Upvotes: 0
Received 0 Upvotes on 0 Posts
Inground Pool Concrete Patio

Due to underground plumbing leaks I had to cut a 16"x16"x10feet trench in the pool concrete deck. When filling the trench with new concrete after replacing the pipes do I need to tie the surrounding existing concrete into the new concrete? Thanks.
 
  #2  
Old 09-18-08, 09:26 PM
B
Join Date: Sep 2008
Location: wisconsin
Posts: 4
Upvotes: 0
Received 0 Upvotes on 0 Posts
Originally Posted by lrodptl
Due to underground plumbing leaks I had to cut a 16"x16"x10feet trench in the pool concrete deck. When filling the trench with new concrete after replacing the pipes do I need to tie the surrounding existing concrete into the new concrete? Thanks.
yes you should if the ground settles under the new concrete the old will hold it in place.use 1/2 or 3/8 rerod
 
 