how much fill required over footer?


  #1  
Old 09-23-08, 08:23 PM
H
Member
Thread Starter
Join Date: Jan 2004
Location: United States
Posts: 1,060
Upvotes: 0
Received 0 Upvotes on 0 Posts
how much fill required over footer?

I have a frost footing around my garage. I am relocating some things to the back wall of garage ( HVAC, pool pump and adding pool heater in future) I want them as low as possible. I plan to level an area, put landscape fabric and then have them put AC condensing units on the plastic bases. Then I will add 2-3 inches of gravel. Is it OK to dig a few inches below the footing so that when I add the gravel it is just covering the top of the footing, or should I have dirt covering the footing completely and if so, how much? I live in Baltimore area and I believe the footing is at least 30in deep.
 
  #2  
Old 09-24-08, 04:19 AM
Speedwrench's Avatar
Member
Join Date: Apr 2008
Location: Oklahoma
Posts: 1,602
Upvotes: 0
Received 0 Upvotes on 0 Posts
you will need to keep the dirt high enough so that there is natural drainage away from the footing. it should slope at least 3" in 10' away from this footing other than that digging down is not a problem.

life begins when the kids leave home and the dog dies.
 
 

Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description: