Pouring a slab for a basketball court

Reply

  #1  
Old 09-10-17, 11:34 AM
Member
Thread Starter
Join Date: Jul 2010
Location: USA
Posts: 58
Received 0 Votes on 0 Posts
Pouring a slab for a basketball court

Hey guys. I've torn up my old basketball court, which was just a slab for an old shed. It was 15' x 19'. I'm going to expand it to 19' x 23'. What tools will I need to rent to do this job? I'll get 2x4s and stakes. What else? A couple trowels, a bull float, a fresno? Rebar? If I want fiber mesh, is that something I request to put in on the mixing truck, or is it something I add when we pour it? Also, for a basketball court, what kind of brush should I use to finish it? Don't want it super rough, but not so smooth that it's slippery. Thoughts?
 
Sponsored Links
  #2  
Old 09-10-17, 05:48 PM
Banned. Rule And/Or Policy Violation
Join Date: Sep 2017
Location: USA
Posts: 517
Received 0 Votes on 0 Posts
Lay the forms & the mesh before the truck arrives. The mesh should be about an inch above grade. If you are going to add one or two control joint, have a control joint tool.


https://i.ytimg.com/vi/MWxqyZ0ATwY/hqdefault.jpg
 
  #3  
Old 09-10-17, 06:37 PM
Member
Thread Starter
Join Date: Jul 2010
Location: USA
Posts: 58
Received 0 Votes on 0 Posts
Cool. I'll add the control joint tool to my list. Isn't fiber mesh something you throw into the mix? I don't want to use wire mesh. I was going to use fiber mesh and rebar instead.
 
  #4  
Old 09-10-17, 09:13 PM
Banned. Rule And/Or Policy Violation
Join Date: Sep 2017
Location: USA
Posts: 517
Received 0 Votes on 0 Posts
I never used fiber mesh. I can't comment on it.
 
  #5  
Old 10-04-17, 03:50 PM
Member
Thread Starter
Join Date: Jul 2010
Location: USA
Posts: 58
Received 0 Votes on 0 Posts
With the grade of my lawn, the top of my forms ended up being about 8 inches above ground. I don't need an 8 inch slab, but need to fill in about 4 inches. Would it be cheaper to fill it with gravel, or just go extra thick with the concrete?
 
  #6  
Old 10-04-17, 04:33 PM
Banned. Rule And/Or Policy Violation
Join Date: Sep 2017
Location: USA
Posts: 517
Received 0 Votes on 0 Posts
8" of concrete will cost a fortune. You could add dirt, compact it & then throw down some crushed recyle before the truck pours the concrete.
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes
 
Ask a Question
Question Title:
Description: