A stairway on one side of my garage had sagged along with the floor. I'm going to have the floor lifted but I decided to first create a footer for the stairway and the landing above separate from the garage floor. So I cut through the floor, created a 2.5 foot deep footer with about 8 inches of concrete reinforced with rebar. On top of that are three coarses of block and mortar. The footer is about 8 feet long overall.

The question I have is how long should I give it to cure before applying significant weight to it? I'm guessing a week would be OK but I could use a qualified opinion please.

Cheers!
 
Sponsored Links
  #2  
Old 01-13-19, 01:32 PM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Location: USA
Posts: 21,714
A lot depends on the mix of the concrete... but generally it is safe to build on after 7 days. Concrete continues to cure beyond that and gets even stronger by the end of a month but I doubt you will be putting point loads on it that would exceed it's current strength. I'd say that after 7 days it's probably at 60% of its full strength. See this chart for a better idea of average cure times.

http://www.ce.memphis.edu/1101/notes...hics/conc3.gif
 
  #3  
Old 01-13-19, 02:33 PM
Member
Thread Starter
Join Date: Jan 2019
Location: USA
Posts: 3
Excellent, thanks! That helps a lot. It's been a week for the footer but only a few days for the block.

Cheers!
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes