There was an emergency while pouring a 5" slab yesterday so we couldn't finish the job. We have one area finished but had to cut a clean edge and then taper down to a section that is only 2" thick.

I'd like to go back tomorrow and finish by pouring new concrete over the shallow (2") area and an empty area, meeting up to the finished 5" area where I cut the edge. My concern is bonding new concrete to the shallow concrete just poured. Is there any type of bonding agent we can use or some method to get a good bond?

Thanks guys.
 
Sponsored Links
  #2  
Old 08-07-19, 12:03 PM
Marq1's Avatar
Member
Join Date: Sep 2016
Location: USA MI
Posts: 4,018
Upvotes Received: 67
Not really, you now have a cold joint regardless of what is applied to "bond" , going to have to just install a control joint!
 
  #3  
Old 08-07-19, 01:43 PM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Location: USA
Posts: 22,718
Upvotes Received: 127
You should really get a saw and cut the concrete where your 5" ends. That way you are pouring 5" against 5". After you cut and remove the thinner concrete you would pin the edge with rebar to tie the two together vertically.
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes