Concrete block cure time.

Today I poured concrete into 2 forms with rebar hooks that will anchor some chains to the ground, the chains will exert almost no load on the concrete. How long should I wait for them to cure before I take them out of the forms and bury them in the ground? Each block is about 1 cubic foot. (I did a 1:1:2 mix if it matters)
 
Sponsored Links
  #2  
Old 02-11-20, 01:33 AM
Marq1's Avatar
Member
Join Date: Sep 2016
Location: USA MI
Posts: 4,984
Received 171 Votes on 158 Posts
Id wait a week, the concrete should be set up sufficiently to handle in that time!
 
  #3  
Old 02-11-20, 04:26 PM
Group Moderator
Join Date: Mar 2003
Location: NC, USA
Posts: 21,612
Received 318 Votes on 292 Posts
The concrete will strengthen rapidly in the first month. If you handle the block gently I'd move it the next day but the longer you wait the stronger it will get, especially if you keep it wet. You can search for "concrete curing strength" and see charts showing how it gains it's strength over time but it's all shades of gray. If you are picking the block up by the outside of the block I'd do it the next day. If you want to pick it up by the hook I'd wait a week to make sure you don't rip the hook out.
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description: