Red face Framing


Renovated basement; new heating system, rewired electric, raised pipes, insulated. Now, the easy(?) part-framing. I have built and need to build enclosures for some pipes that could not be moved without major investment. I also have to build an enclosure for steel beam (ugh [any simple suggestions]? One more thing, my top landing hangs lower than the joises. To even them up I must use 1 1/2 x 1 1/2 x (length varies) "shems", is there another way? When it is time to install drywall how will I keep track of the nails/screws?
 
Sponsored Links
  #2  
Old 02-04-09, 03:41 PM
J
Member
Join Date: Oct 2006
Location: Wilmington
Posts: 4,214
Received 0 Votes on 0 Posts
I think I understand what you need to do, but I think you are on the wrong track. You can box a beam with almost no change in ceiling height. Run 1x or 2x on either side of the beam, flush with the bottom of the beam, then nail/screw a piece of finished paneling, drywall, etc to those pieces. net lose to the ceiling, less than 1/4".

Not sure what you mean by "keeping track of the screws"?????
 
  #3  
Old 02-05-09, 06:56 AM
L
Member
Thread Starter
Join Date: Feb 2009
Location: Maryland
Posts: 9
Received 0 Votes on 0 Posts
Perfect! Thank you.
"keeping track of screws".
I thought that I would need to level the joists with the landing, but I think I can get around it. If I were going to level all of the joists, I would be using screws to attach the shems to the joists, then attach the drywall - thus loosing track of screws in the joists (unless I measure them out and transpose their location and avoid them when drywall gets screwed in [?])
 
  #4  
Old 02-05-09, 03:32 PM
J
Member
Join Date: Oct 2006
Location: Wilmington
Posts: 4,214
Received 0 Votes on 0 Posts
The word is "shim", usually a wedge shaped piece to change the level of another piece. But that is not the issue.

You can box around the landing beam, or shim as you suggested to make that all the same level. More frame work one way, more finish work the other way. Not to worry about screws when you put up drywall, if you hit a screw underneath, move over slightly.
 
  #5  
Old 02-06-09, 06:06 AM
L
Member
Thread Starter
Join Date: Feb 2009
Location: Maryland
Posts: 9
Received 0 Votes on 0 Posts
Smile

Very much appreciate the suggestions, corrections and advice.
 
Reply
Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description:
Your question will be posted in: