I am remodeling my bathroom....we are replacing our old tub with a new jacquzzi tub....do I install the new tile floor first or do I replace the tub and shower first?
 
  #2  
Old 07-02-01, 04:44 AM
Guest
Visiting Guest
Posts: n/a
I'd do the tub first, unless you want tile under the tub. Otherwise, it's easier to cut tiles to fit around the tub than to cut the tub to fit around the tile.
Matt
 
  #3  
Old 07-02-01, 12:43 PM
Guest
Visiting Guest
Posts: n/a
Do the tub first. That way, if later on you want to retile the floor, or if a tile gets damaged, you can just lay new tiles without messing with the tub. Consider also that you may damage the freshly laid tile floor while installing the tub. Laying tiles generally involve a lot less heavy machinery so the potential for damage is much smaller.
 
 