service panel connection

Reply

  #1  
Old 04-18-07, 11:17 PM
Member
Thread Starter
Join Date: Apr 2007
Posts: 3
service panel connection

my question is, there any code problem with running flexible metal (greenfield) directly from the Main service panel, or should i use a short piece of conduit.
 
Sponsored Links
  #2  
Old 04-19-07, 12:46 AM
Member
Join Date: Mar 2006
Location: Wet side of Washington state.
Posts: 18,386
There is no limitation in the National code that I am aware of. There may be such a limitation in your LOCAL code.
 
  #3  
Old 04-19-07, 09:57 AM
Forum Topic Moderator
Join Date: Feb 2005
Location: Near Lansing, Michigan
Posts: 10,335
From the panel to where? In a ceiling, finished wall or exposed wall?
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes
'