Grounding A Swimming Pool
We are wiring a semi-inground pool. My husband was an electrician 15 years ago and knows how to ground above ground pools but the new semi-inground seem to be grounded already just by installing. is this true or is there something else he needs to do? Where can we get this info?
#2
Since he was an electrician he should know that the pool and other equipment needs to be BONDED, not grounded.
You can read the National Electrical Code for the specific requirements.
Pools are no place to be guessing about.
You can read the National Electrical Code for the specific requirements.
Pools are no place to be guessing about.
#3
Member
Join Date: Sep 2003
Location: Central New York State
Posts: 13,245
Upvotes: 0
Received 0 Upvotes
on
0 Posts
As pcboss said, pools are not grounded. They are bonded.
All metal, including a metal pool, ladder, whatever are bonded together and to a bond connection on the pump.
All metal, including a metal pool, ladder, whatever are bonded together and to a bond connection on the pump.
#4
Member
Join Date: Jan 2004
Location: Oregon
Posts: 1,104
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Pool wiring has its own section of code and some very specific rules, and I know enough to know that I don't know them. You will need to double check which version of the NEC is followed in your area, and then read the swimming pool section.
In particular, you are going to have to determine if you are required to install an 'equipotential bonding grid'; this is required for in ground installations, but I don't know what 'semi-inground' means with respect to this requirement. You will want to know about these bonding requirements before you start anyting, because doing them after the fact could be _very_ expensive.
-Jon
In particular, you are going to have to determine if you are required to install an 'equipotential bonding grid'; this is required for in ground installations, but I don't know what 'semi-inground' means with respect to this requirement. You will want to know about these bonding requirements before you start anyting, because doing them after the fact could be _very_ expensive.
-Jon