Romex and Romex staples

is it ok to place 2 pieces of Romex under 1 Staple such as when running two pieces down the inside of a wall stud? Or should they each be strapped seperately? Thanks
 
Sponsored Links
  #2  
Old 02-04-08, 08:36 PM
J.D.S.'s Avatar
Member
Join Date: Jan 2008
Location: Central Minnesota
Posts: 27
Received 0 Votes on 0 Posts
Pretty vague question, but yes. In fact, you are required to do this on a 2 by 4 wall. The reason: To meet the clearance requirement of not less than 1 1/4" from the surface of the wall.
 
  #3  
Old 02-04-08, 08:56 PM
Banned. Rule And/Or Policy Violation
Thread Starter
Join Date: Nov 2007
Location: KY
Posts: 77
Received 0 Votes on 0 Posts
Thanks for the help. Sorry I was so vague. Im just adding a couple outlets in the basement. Just wanted to make sure it was ok to have the feeder cable and the cable for the next outlet under one Romex clamp.

So would this same idea apply to strapping along floor joists where someone would have say 2 or 3 circuits running along a floor joist in the basement?
 
  #4  
Old 02-04-08, 09:27 PM
Member
Join Date: Sep 2000
Location: United States
Posts: 18,497
Received 0 Votes on 0 Posts
Your first post said "staple" and your second post said "Romex clamp". These are two entirely different things, but the answer is usually yes for both.

Normally people don't string Romex along the bottom floor joists. There are special protection requirements (i.e., you usually need a running board), and putting them there usually makes it difficult to finish the ceiling later.
 
  #5  
Old 02-04-08, 09:44 PM
Banned. Rule And/Or Policy Violation
Thread Starter
Join Date: Nov 2007
Location: KY
Posts: 77
Received 0 Votes on 0 Posts
man, Im really making this difficult. Im not going to strap any new Romex to the bottom of the floor joists. All existing and new Romex passes thru the center/or near center of the floor joists. I was just curious about when Romex is run parallel to the joist if two pieces of romex could again be put under one staple. Sorry about saying clamp in my other post. DOH!
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes
 
Ask a Question
Question Title:
Description:
Your question will be posted in: