Hi,if the ground is terminated in the meter socket do I install the the bond screw through neutral bar in the panel ,first disconnect is in the panel.
 
  #2  
Old 04-14-13, 08:20 AM
CasualJoe's Avatar
Member
Join Date: Jan 2010
Location: United States
Posts: 10,758
Received 97 Votes on 87 Posts
Hi,if the ground is terminated in the meter socket do I install the the bond screw through neutral bar in the panel ,first disconnect is in the panel.
Some power companies require this and some don't; it is required to be that way in my area too. In answer to your question, yes, install the bonding screw to bond the grounded neutral to the panel box. Your water service ground also attaches to the neutral bus in the panel.
 
  #3  
Old 04-14-13, 08:37 AM
Geochurchi's Avatar
Member
Thread Starter
Join Date: Nov 2012
Location: United States
Posts: 4,960
Received 88 Votes on 83 Posts
Bond screw

The water service will be the ground connection along with the supplemental ground from a ground rod.
 
  #4  
Old 04-14-13, 02:03 PM
CasualJoe's Avatar
Member
Join Date: Jan 2010
Location: United States
Posts: 10,758
Received 97 Votes on 87 Posts
It could be different in many jurisdictions, but here the ground rod is connected to the neutral inside the meter socket and water service ground is connected to the neutral bus in the main panel. Check with your AHJ and power company for their requirements.
 
 