Would an electrician have to pull the meter (disconnect power) to tighten a main circuit breaker or the terminals where the 3 incoming wires are attached?

What about the meter socket, would the service drop have to be disconnected to tighten both sides?

NOTE- I said electrician I am not in need of this repair and if so I am not that brave.
 
  #2  
Old 03-16-14, 05:58 AM
Geochurchi's Avatar
Member
Join Date: Nov 2012
Posts: 5,074
Received 161 Upvotes on 147 Posts
Not likely for the mains, but for the meter the utility co. should be involved to reseal the meter so that being said have the meter pulled and at the same time tighten the mains, that would be the safest way.
 
  #3  
Old 03-16-14, 07:12 AM
Tolyn Ironhand's Avatar
Group Moderator
Join Date: Nov 2007
Location: United States
Posts: 14,332
Received 877 Upvotes on 740 Posts
The procedure will depend on your location. Around here an electrician can cut the seal and do the work required. Then all it takes is phone call or e-mail to the power company letting them know that the seal has been removed and it needs a new one.
 
  #4  
Old 03-16-14, 07:26 AM
Z
Member
Thread Starter
Join Date: Oct 2013
Posts: 487
Upvotes: 0
Received 0 Upvotes on 0 Posts
I know the procedure for pulling the meter and having it sealed.

Meter socket aside,

why can those main connections inside the panel can be tightened down without turning off power without the electrician getting fried?
 
  #5  
Old 03-16-14, 08:11 AM
Tolyn Ironhand's Avatar
Group Moderator
Join Date: Nov 2007
Location: United States
Posts: 14,332
Received 877 Upvotes on 740 Posts
The connections at the main breaker can be shut off by pulling the meter. However, electricians have the experience and training on how to safely work around energized circuits. This is NOT a DIY job!
 
  #6  
Old 03-16-14, 08:18 AM
Z
Member
Thread Starter
Join Date: Oct 2013
Posts: 487
Upvotes: 0
Received 0 Upvotes on 0 Posts
Of course. But I am trying to gauge if I have an electrician out can he tighten the mains live, without having to pull the meter and go thru that hassle.
 
  #7  
Old 03-16-14, 08:22 AM
Tolyn Ironhand's Avatar
Group Moderator
Join Date: Nov 2007
Location: United States
Posts: 14,332
Received 877 Upvotes on 740 Posts
I suggest calling the electrician and ask them if they will do it hot. I doubt pulling the meter is much of a hassle and the electrician could handle the power company if needed. Is there a reason why you feel you need the connections tightened? Are you experiencing any issues?
 
  #8  
Old 03-16-14, 06:59 PM
CasualJoe's Avatar
Member
Join Date: Jan 2010
Location: United States
Posts: 9,871
Received 185 Upvotes on 166 Posts
I am trying to gauge if I have an electrician out can he tighten the mains live, without having to pull the meter and go thru that hassle.
Sure he can, but will he? Most electricians will choose the safer route and pull the meter if it needs to be pulled.
 
  #9  
Old 03-16-14, 07:05 PM
pcboss's Avatar
Forum Topic Moderator
Join Date: Jul 2002
Location: Maryland
Posts: 13,976
Received 194 Upvotes on 170 Posts
The availability of insulated tools and protective equipment is also used to allow this to be done.
 
  #10  
Old 03-17-14, 06:16 AM
Z
Member
Thread Starter
Join Date: Oct 2013
Posts: 487
Upvotes: 0
Received 0 Upvotes on 0 Posts
The availability of insulated tools and protective equipment is also used to allow this to be done.
I had an electrician over this morning and asked him to tighten down the connections in the panel and he had no problem doing so live (barehanded and standard screwdriver).... nerves of steel. I'll keep turning breakers off when changing light switches thank you.
 

Last edited by Tolyn Ironhand; 03-17-14 at 05:18 PM. Reason: Removed off color remark.
  #11  
Old 03-18-14, 03:18 AM
Z
Member
Thread Starter
Join Date: Oct 2013
Posts: 487
Upvotes: 0
Received 0 Upvotes on 0 Posts
OK, off color...... that's hogwash. (Is it ok to say hogwash?)
 
  #12  
Old 03-18-14, 05:13 AM
A
Member
Join Date: Mar 2010
Location: USA
Posts: 4,523
Upvotes: 0
Received 278 Upvotes on 254 Posts
It is not necessary to turn off the power (e.g. pull the meter) before tightening the big lugs that hold the service wires in the panel. But if your screwdriver slips and touches something else at the same time you could get a big spark that frightens you and you might do something harmful such as jerk your arm against some sharp metal nearby.

Of course you need to open the meter box to tighten up any connections inside it. See preceding regarding breaking the seal.
 
  #13  
Old 03-18-14, 06:59 PM
Tolyn Ironhand's Avatar
Group Moderator
Join Date: Nov 2007
Location: United States
Posts: 14,332
Received 877 Upvotes on 740 Posts
Hogwash is fine.
------------------
 
 