Sleeve needed for Schedule 80 through Cinder Block?
#1
Member
Thread Starter
Join Date: Nov 2013
Location: USA
Posts: 6
Upvotes: 0
Received 0 Upvotes
on
0 Posts

If I am going through a Cinder Block wall (foundation) with Schedule 80 conduit do I need to sleeve the hole in the Cinder Block? The wires are protected via the Schedule 80 conduit, but from what I understand it comes into question whether or not the conduit itself needs protected. I have tried to research other electrical forums and even NEC codes, but I had problems finding an answer. I do know that if it was a water pipe going through the wall then it would need a sleeve.