Ballpark figure, how many hours would it take to install 14' lvl beam and two steel posts [bearing wall demolition completed] experience contractor and one helper.
Thank you
Thank you
#3
Member
Thread Starter
Join Date: Jul 2008
Location: canada
Posts: 334
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Thanks for reply,one of the steel posts is about 17' long and extends right down to a concrete footing in the basement ,there is also the welding of top and bottom plates to the posts and beefing up one joist.Temporarely shoring on both sides of the wall is also needed.Again I just need a general idea of the time invoved as I woul be charged by the hour.
Thank you
Thank you
#4
Member
Join Date: Feb 2006
Location: New York
Posts: 155
Upvotes: 0
Received 0 Upvotes
on
0 Posts
If you have yet to put up temporary walls for support then there is still some demo left to be done. I would think this would take at least a full day, maybe a little longer
#6
Member
Join Date: Jan 2009
Location: springfield mo
Posts: 17
Upvotes: 0
Received 0 Upvotes
on
0 Posts
you could probably figure it like this 30 an hour for the carpenter and 15 for the helper... thats what i charge in missouri so a grand sounds about right if it takes two days but i dont see it taking that long without looking at the job... just putting in the beam if it has something already in place to set it on shouldnt take but about 2 hour if you take into account the setup of tools and the wall height if its 17' but also theres a min of 5 hours on my time