Concrete Slab below 2nd Floor Bathroom Tile??

Reply

  #1  
Old 03-01-11, 12:08 PM
Member
Thread Starter
Join Date: Feb 2010
Location: US
Posts: 7
Concrete Slab below 2nd Floor Bathroom Tile??

I just started a bathroom renovation for a 2nd Floor Master bath and found a 3-4" slab of concrete below the original floor tiles and joists. Was this a common approach used on homes built in the 20's? I'm worried about the extra weight of the new bathroom if I leave it in place and also concerned about opening a can of worms if I remove it. Would you recommend I leave this slab in-place or start with a clean slate and rebuild the joists and sub-floor?
 
Sponsored Links
  #2  
Old 03-02-11, 07:08 AM
Temporarily Suspended
Join Date: Jul 2008
Location: NY
Posts: 10,986
You're right about the worms & yes, it was common at one time. Leave it there.
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes