i put down two sheets of cement board in my bathroom, and i didn't know you had to put thin set on the wood floor under it. i have already screwed it down and the tub has been installed. i have a third piece to install do i put thin set under it, and will this screw up the mesh backed tile i am going to install..i did a gut job on my bathroom..please help
 
Sponsored Links
  #2  
Old 11-28-13, 05:09 PM
chandler's Avatar
Banned. Rule And/Or Policy Violation
Join Date: Dec 2005
Location: USA
Posts: 39,968
Welcome to the forums! Your tub should not be sitting on cbu. The tub is normally installed prior to cbu and tile. Although not recommended, since you already have the other two pieces captive, install the final piece without it, too as you may have problems with height if you don't.

Cutting the other two pieces out and laying it all in thinset would be the best option.
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes