repairing shed


  #1  
Old 06-08-00, 07:41 PM
Guest
Visiting Guest
Posts: n/a
Post

I am about to attempt to save my old shed. The former owners let termites eat from beneath. It is 6x8 and it very good shape from floor up. (Not the floor) How should I go about lifting this building so I can replace the floor and underside. It is probably not that heavy as the entire thing other than studs is metal. Lowes suggested a crow bar to lift and slide new treated joists under. Appreciate your suggestions. Carolyn
 
  #2  
Old 06-09-00, 07:38 PM
Guest
Visiting Guest
Posts: n/a
Post

My suggestion is two people. One to push down on the crow bar, and the other guy to slide the beam under.
 
 

Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description: