time estimation of garage project
#1

Could a 15 ft. x 27ft. garage be upgraded to include wall outlets, spotlights, insulated and sheetrocked including general painting of celing and walls within an approximate 150 hr. of time using standard drill for screwing sheetrock and portable skill saw for cutting wood. This would also include modifying three windows to accept an upgraded quality of double pane glass and replacing two pedestrian doors which also need to be modified. Thanks for any information.