plumbing rough-in


  #1  
Old 02-21-00, 06:12 AM
Guest
Visiting Guest
Posts: n/a
Question

For upstairs master bath, the access for double lavs will be only in one place for both 3/4 lines (with 1/2 tee's). The stud wall is non-load bearing, can side by side 1/2 inch holes be used to reach both lavs?
Or do I need to go with one above the other.?
Engineered floor joists prevent another access.
 
  #2  
Old 02-21-00, 05:23 PM
Guest
Visiting Guest
Posts: n/a
Post

I HAVE AN IDEA WHAT YOU ARE SAYING BUT NOT
ENTIRELY SURE,CAN YOU WORD ANOTHER WAY.
 
  #3  
Old 02-21-00, 05:39 PM
Guest
Visiting Guest
Posts: n/a
Smile

I would go with one higher than the other for easier clearance (hot water on the left, cold water on the right..cutoff valves on all four). Good luck!
 
  #4  
Old 02-22-00, 05:17 AM
Guest
Visiting Guest
Posts: n/a
Post

Apparently I will have to sister a couple of studs to those that I drill two 5/8's holes through because that is more than 1/2 of a studs 1 1/2 inch thickness.
 
  #5  
Old 02-22-00, 06:18 PM
Guest
Visiting Guest
Posts: n/a
Smile

Dave:
You have to be a little more specific for us to help you. O.K.?
 
 

Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description:
Your question will be posted in: