slab on grade

do i glue the toilet flange in before we pour the concrete? or do we frame a box at that location then install it afterwards?
 
  #2  
Old 10-06-06, 03:40 AM
chandler's Avatar
Banned. Rule And/Or Policy Violation
Join Date: Dec 2005
Location: USA
Posts: 36,607
Upvotes: 0
Received 11 Upvotes on 10 Posts
NO, leave a sealed stub at least a foot above your slab. After all the work is done, and you are prepared to install your fixtures, you can cut off the stub and install your flange. It will sit flush to the floor and only stick up 3/8" which is perfect for toilet installation. Installing the flange too early will cause damage, I guarantee it.
 
  #3  
Old 10-06-06, 07:03 AM
Z
Member
Thread Starter
Join Date: Oct 2003
Posts: 5
Upvotes: 0
Received 0 Upvotes on 0 Posts
closet flange

thanks for the information. thanks zach14
 
 