For upstairs master bath, the access for double lavs will be only in one place for both 3/4 lines (with 1/2 tee's). The stud wall is non-load bearing, can side by side 1/2 inch holes be used to reach both lavs?
Or do I need to go with one above the other.?
Engineered floor joists prevent another access.
 
Sponsored Links
  #2  
Old 02-21-00, 05:23 PM
Visiting Guest
Posts: n/a
Post

I HAVE AN IDEA WHAT YOU ARE SAYING BUT NOT
ENTIRELY SURE,CAN YOU WORD ANOTHER WAY.
 
  #3  
Old 02-21-00, 05:39 PM
Join Date: Dec 1999
Location: Northeastern NC On The Albemarle Sound
Posts: 10,952
Smile

I would go with one higher than the other for easier clearance (hot water on the left, cold water on the right..cutoff valves on all four). Good luck!
 
  #4  
Old 02-22-00, 05:17 AM
Visiting Guest
Posts: n/a
Post

Apparently I will have to sister a couple of studs to those that I drill two 5/8's holes through because that is more than 1/2 of a studs 1 1/2 inch thickness.
 
  #5  
Old 02-22-00, 06:18 PM
Join Date: Dec 1999
Location: Northeastern NC On The Albemarle Sound
Posts: 10,952
Smile

Dave:
You have to be a little more specific for us to help you. O.K.?
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes