02-22-18, 08:07 PM
Replies: 12
Views: 1,323
Posted By Jon Mullins

Not adding load, just moving the meter outside...

Not adding load, just moving the meter outside and upgrading to 200 amp service equipment.
02-19-18, 05:55 PM
Replies: 12
Views: 1,323
Posted By Jon Mullins

ibpooks, thanks for the info. That was basically...

ibpooks, thanks for the info. That was basically what I had planned only with me doing all installation from the panel to the weatherhead as well as the grounding upgrade. Regarding location, I plan...
02-18-18, 07:53 PM
Replies: 12
Views: 1,323
Posted By Jon Mullins

That makes sense. I never thought about it that...

That makes sense. I never thought about it that way.
02-18-18, 07:30 PM
Replies: 12
Views: 1,323
Posted By Jon Mullins

Yeah, I looked in several places before posting...

Yeah, I looked in several places before posting this question and there's not much information out there. I would think that the utility side would have a higher rating, but that's purely an...
02-18-18, 06:54 PM
Replies: 12
Views: 1,323
Posted By Jon Mullins

Service entrance upgrade question

I want to move my meter to the outside and upgrade my service to 200 amps, but I'm unsure on some things regarding cost. The meter will be moved to the outside at present entry point.
Presently my...
09-02-16, 12:41 PM
Replies: 3
Views: 582
Posted By Jon Mullins

Yes, the site did that when I attached it. ...

Yes, the site did that when I attached it.

if you right click and open it in a new tab, it is oriented correctly
09-02-16, 09:38 AM
Replies: 3
Views: 582
Posted By Jon Mullins

Ground electrode requirement question

At the moment, my system is grounded at the incoming water pipe (before the meter). I will be installing a ground rod very soon, but have a couple questions about requirements.


How many rods...
09-02-16, 09:13 AM
Replies: 2
Views: 736
Posted By Jon Mullins

Thanks for the answer ray2047

Thanks for the answer ray2047
09-02-16, 08:51 AM
Replies: 2
Views: 736
Posted By Jon Mullins

Load center terminology confusion

Can someone explain what 40 circuit 30 space or 40 circuit 20 space means?
Never mind, I found my answer.
For others wondering:
in the case of 40 circuit - 30 space, you have a total of 30...
09-01-16, 09:48 AM
Replies: 11
Views: 2,809
Posted By Jon Mullins

The primary goal is to remove/replace the mashup...

The primary goal is to remove/replace the mashup of almost every type of wiring (1925 construction knob/tube, BT, cloth 3 conductor, etc). I'm pretty sure if it was made or sold in the last 44 years...
09-01-16, 09:18 AM
Replies: 11
Views: 2,809
Posted By Jon Mullins

Thanks for the NEC Cite, so based on this, I...

Thanks for the NEC Cite, so based on this, I already have 100 amp service into the box at the main lugs. Am I understanding this correctly?

If that is the case, then I can check that box on my to...
09-01-16, 09:05 AM
Replies: 11
Views: 2,809
Posted By Jon Mullins

Just to make sure I understand correctly: To...

Just to make sure I understand correctly:

To upgrade to 125 amp service, I just need to replace the cable between the panel and the meter with #1 copper but no cable replacement on the incoming...
08-31-16, 11:00 PM
Replies: 11
Views: 2,809
Posted By Jon Mullins

What amp service do I have?

Everywhere I've looked says that my service amperage is equal to the main breaker. But I don't have a main breaker between the hot lugs and the central hot bus. There is a 60 amp double breaker...