Search: Posts Made By: marksr
Showing results 1 to 2 of 2
Search took 0.00 seconds.
Replies: 36
Views: 3,826
Posted By marksr

If the soil/fill is wet it will slow the set up...

If the soil/fill is wet it will slow the set up time of the concrete placed over it, not necessarily a bad thing - a lot depends on how wet it is.
Replies: 36
Views: 3,826
Posted By marksr

I assume they intend to use extra rebar or rebar...

I assume they intend to use extra rebar or rebar instead of wire mesh. I painted some houses that were built in a drained swamp. They had to pour monolithic slabs with a lot of steel, as far as I...
Showing results 1 to 2 of 2


 
Forum Jump