Search: Posts Made By: Norm201
Showing results 1 to 1 of 1
Search took 0.01 seconds.
Replies: 4
Views: 4,041
Posted By Norm201

use backer rod. Stuff the rod down into the...

use backer rod. Stuff the rod down into the crevices and allow about a 1/2 to 1/4 inch of depth left to fill with caulking or mortar mix.
Showing results 1 to 1 of 1


 
Forum Jump