Search: Posts Made By: ecman51
Showing results 1 to 2 of 2
Search took 0.03 seconds.
11-14-08, 06:05 PM
Replies: 5
Views: 2,742
Posted By ecman51

Then leave the tee and slip in the new vertical...

Then leave the tee and slip in the new vertical and horizontal piece. Cut each tail to length, if need be.

Each old part should be removeable. The vertical overflow piece should lift up and out....
11-13-08, 06:03 PM
Replies: 5
Views: 2,742
Posted By ecman51

I knew what you had described, even before I saw...

I knew what you had described, even before I saw your pic. Do you have enough pipe above your letter "s"?, to cut that pipe, in order to put a compression coupling around it and the new tub drain?
Showing results 1 to 2 of 2


 
Forum Jump