Search: Posts Made By: joed
Showing results 1 to 1 of 1
Search took 0.00 seconds.
08-28-19, 03:34 PM
Replies: 6
Views: 363
Posted By joed

The main service disconnect at the meter makes...

The main service disconnect at the meter makes the panel a sub panel. It should have a four wire feed and the neutral and ground unbonded.
Showing results 1 to 1 of 1


 
Forum Jump