Search: Posts Made By: Tolyn Ironhand
Showing results 1 to 5 of 5
Search took 0.01 seconds.
05-26-14, 07:31 AM
Replies: 20
Views: 1,681
Posted By Tolyn Ironhand

Based on the amendment you posted, the OP's using...

Based on the amendment you posted, the OP's using aluminum wire for the installation would be acceptable in your location. (However the ground would need to be copper) He is installing a feeder, not...
05-25-14, 09:21 PM
Replies: 20
Views: 1,681
Posted By Tolyn Ironhand

Yup, that's the one. It appears to be on sale...

Yup, that's the one. It appears to be on sale through 7/28/14. "Normal" price is $5.84.

While $300 does seam to be a bit high, based on your material costs you are quoting, it might not be that...
05-25-14, 09:21 AM
Replies: 20
Views: 1,681
Posted By Tolyn Ironhand

The OP's panel is a GE. which is why I said not...

The OP's panel is a GE. which is why I said not to use Cutler Hammer breakers. GE breakers should be readily available.

Cutler Hammer has two panel lines, CH and BR. CH panels are the more...
05-24-14, 01:58 PM
Replies: 20
Views: 1,681
Posted By Tolyn Ironhand

Looking at your crawlspace I think I would...

Looking at your crawlspace I think I would install PVC or EMT conduit and run THHN wire. There are many hangers that can be used to install pipe to steel beams like you have. It would be more labor,...
05-24-14, 05:30 AM
Replies: 20
Views: 1,681
Posted By Tolyn Ironhand

IIRC anything over 50 amp will require 2 1"...

IIRC anything over 50 amp will require 2 1" spaces in your GE panel. To install a 100 amp breaker you will need 4 skinny spaces. This can be fairly easy since you can either move some things around,...
Showing results 1 to 5 of 5


 
Forum Jump