Winter Install Hard Maple???

Reply

  #1  
Old 12-29-08, 11:04 AM
Member
Thread Starter
Join Date: Apr 2008
Posts: 3
Question Winter Install Hard Maple???

Hi, I'm installing 3/4"X 3 1/4" #2 Maple over new 3/4 ply subfloor. House has FA heat in winter and AC in summer as and if needed. My subfloor MC reads 9.5 to 10%. Indoor temp is held at 68 degs. Indoor RH is holding at 41%. My maple has been in the house at these conditions for over two months and is reading 6%. Could be lower as My Mini E/D only reads down to 6%. Home is short north of Seattle, WA. near the coast, I am using Aquabar-B as an underlayment paper, 2" cleats @ 4" oc and 2" from ends. I'm half way done and it donned on me that I should have be thinking about humidity changing this summer. Is my wood to dry? My house has a lot of natural wood trim. Do you think I should add humidifier/dehumidifier to my HVAC system? Now I'm concerned the the floor may buckle come summertime. Thanks !! Rick.
 
Sponsored Links
  #2  
Old 01-04-09, 10:24 PM
Member
Thread Starter
Join Date: Apr 2008
Posts: 3
Might as well delete me, Thanks just the same.
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes
'