Installing end cap
#1
Member
Thread Starter
Join Date: Dec 2008
Location: Mass
Posts: 281
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Installing end cap


#2
Cut the moisture barrier flush with the floor so you can install base molding. You did leave at least 1/2" gap at the walls, right? Is this laminate or engineered flooring? Curious.
#4
Not bad looking laminate. I have laid similar 5/8" click lock engineered flooring. So just trim all your excess underlayment. You aren't building a pool, just a breathing pattern for the flooring as well as some cushion.