Beveling baseboards

Reply

  #1  
Old 01-31-17, 03:17 PM
Member
Thread Starter
Join Date: Aug 2013
Location: USA
Posts: 13
Beveling baseboards

I have laid in a new laminate floor and now wish to install the baseboards. Due to some aspects, I have two different sizes - 5" tall and 7-1/2" tall. Both are too wide/tall to cut a bevel (for joining at the corners) with my 10" table saw. Is there some way to cut these bevels? I'm at a loss as to how to get them cut so they join at the corners. Or am I missing something?
 
Sponsored Links
  #2  
Old 01-31-17, 03:35 PM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Location: USA
Posts: 20,214
You don't generally miter inside corners... they get coped. Outside corners get mitered. And you generally use a miter saw to install base, not a table saw.

If a table saw is the only tool you have, you would need to use a miter gauge that has a hold down, and a large table or jig to hold the piece perpendicular to the blade, since it will néed to be flat on the table, with the saw blade set at a 45.

Not a real good way to do it. That's why the miter saw was created.
 
  #3  
Old 01-31-17, 03:39 PM
Member
Join Date: Jan 2011
Location: USA
Posts: 4,138
Post some pictures.
All the base molds need to be the same size.
I agree 110% no way would I be using a table saw for trim work unless I was ripping it.
 
  #4  
Old 01-31-17, 04:11 PM
Member
Thread Starter
Join Date: Aug 2013
Location: USA
Posts: 13
I didn't make myself clear; each baseboard size will be on different walls. Each wall will have it's one size.
I know about miter saws but I thought the height/width of the boards would be outside of the diameter of the blade, therefore couldn't be cut.
I don't understand the terminology; isn't coping just an 'inside' miter?
As I understood mitering, the board sits upright and the blade comes in at an angle, cutting the piece vertically.
I'm getting a whole bunch of 'backend fetch' errors when I try to reply and half of my reply is lost; at least the part that wasn't autosaved.
I'll try again - The saw blade can only cut a little less than half its diameter, so if the piece is wider/taller than that, it can't cut it. Neither one of my pieces are less than 5" so a 10" blade won't cut it through.
I feel like I'm missing something here (just my ignorance, I guess).
 
  #5  
Old 01-31-17, 04:15 PM
Member
Thread Starter
Join Date: Aug 2013
Location: USA
Posts: 13
Angry

Well, that posted without an error - whew!
 
  #6  
Old 01-31-17, 04:18 PM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Location: USA
Posts: 20,214
You lay the piece flat on the miter saw table and bevel the blade. Not upright against the fence. And a 12" miter saw helps cut wider stock.
 
  #7  
Old 01-31-17, 04:39 PM
chandler's Avatar
Banned. Rule And/Or Policy Violation
Join Date: Dec 2005
Location: USA
Posts: 39,968
I'm really not understanding why there are different heights of speedbase in the rooms. Is there a reason for it? You will need a 12" belt driven saw with a remote motor like Dewalt or Ridgid to cut really tall base in one movement.
 
  #8  
Old 01-31-17, 05:10 PM
Member
Join Date: May 2015
Location: USA
Posts: 3,138
A cope starts with mitering the end, then a coping saw is used to cut along the edge, creating a flat end that will mate against the other piece. It's a little more effort to do, but is a lot more forgiving to install and tolerates minor movement and misalignment better than an inside miter would.

http://www.kelleher.com/documents/Coping.pdf
 
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
Display Modes
'