Shower drain pit

Reply

  #1  
Old 01-08-17, 03:14 PM
D
Member
Thread Starter
Join Date: Jul 2015
Posts: 34
Received 0 Votes on 0 Posts
Shower drain pit

I removed a fiberglass shower because we never use it and we are converting the space from a full bathroom to half mud room, half half-bath. My question is since I removed the shower and now I have an open hole in the floor where the shower drain is, can I fill that in with concrete since it will no longer be used for a shower? If not, how can I fill it in in order to put tile over it.

Thanks.
 
Sponsored Links
  #2  
Old 01-08-17, 05:56 PM
Marq1's Avatar
Member
Join Date: Sep 2016
Location: USA MI
Posts: 6,552
Received 370 Votes on 345 Posts
You will want to cap the pipe first.

Hard to say what needs to be done with the floor, a picture would be very helpfull/
 
  #3  
Old 01-09-17, 04:26 AM
chandler's Avatar
Banned. Rule And/Or Policy Violation
Join Date: Dec 2005
Location: USA
Posts: 39,965
Received 6 Votes on 6 Posts
If it is a standard 12" x 12" shower pit, and you properly cap the pipe, you can fill it with concrete, but it will be a permanent abandonment. Dig down in the pit sufficiently to expose the trap and make sure they didn't leave an adjustable joint down there. All joints will need to be glued closed. Then fill it with gravel up to the point of the original concrete base and finish with concrete.
 
Reply
Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description: