prep for bathroom ceramic floor


  #1  
Old 04-21-04, 08:46 AM
gettingstarted
Visiting Guest
Posts: n/a
prep for bathroom ceramic floor

We're doing the finish work on a bathroom remodeling project. The contractor laid 1/4" cementboard (fiberboard?) on the floor. The gaps between sheets are pretty tight--1/8" or less. Do we need to tape with fiber-mesh and thinset as a separate step before thinsetting and laying tile?

He lay the cementboard over thinset, and secured it every 4 inches or less--at the edges of the sheets--if that makes any difference. Thanks in advance!
 
  #2  
Old 04-21-04, 07:04 PM
floorman
Visiting Guest
Posts: n/a
1/4 inch may be a little thin for the floor ,how thick is you're subfloor and what is it?o.s.b. plywood?particle board?In any case though yes is the answer to you're question
 
 

Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description:
Your question will be posted in: