Removing Ceramic Tile
#1
Member
Thread Starter
Join Date: Jun 2011
Location: USA
Posts: 53
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Removing Ceramic Tile
I am remodeling a bathroom & want to remove the ceramic floor (6x6 tiles) & also the shower tiles. The floor tiles were put down the old fashioned way(metal lath, mud, tile). What is the best way to remove the everything?
Thanks
Thanks
#3
After removing the toilet, vanity, doors etc, start at the doorway and with a pry bar and hammer start prying between the mud and subfloor. You'll also need wire cutters to cut the lath. It's a dusty job, long sleeves, eye protection, leather work gloves.
The rest of the details will come to you in short order. What will you be installing after?
Jaz
The rest of the details will come to you in short order. What will you be installing after?
Jaz
#7
Member
Thread Starter
Join Date: Jun 2011
Location: USA
Posts: 53
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Removing Ceramic Tile
Thanks to you both for the info.
The tiles are in good shape & level. To to worried about the door jambs & height as there is about a 1" gap between the tile & door now.
What I am worried about is the extra weight of the tile on the floor joists as this bathroom is on my second floor.
The tiles are in good shape & level. To to worried about the door jambs & height as there is about a 1" gap between the tile & door now.
What I am worried about is the extra weight of the tile on the floor joists as this bathroom is on my second floor.
#8
Member
Is the current tile in good shape, no cracked tiles, no cracked or loose grout? If so, the added weight of the new tile will be fine. You will need to clean the existing tile and grout well. Make sure, no oils and waxes remain. Depending on the type of tile you have, you may want to abraid the existing tile for better thinset bond. Use a good quality modified thinset for this, don't use the cheapo stuff.
There are some issues you need to concern yourself with.
What will you have to do to the existing closet flange to make it work with the added height? Any issues with baseboard heat or floor registers? Will there be any problems with raising the existing baseboard moulding. At the doorway, what kind of transition piece do you have now between the bathroom and the existing room? If its a marble saddle, you may have to remove it and replace with another, or something else. You said door height clearance isnt an issue. Will you be replacing the vanity? If not, is there tile under the vanity now? If so, you may want to consider removing the vanity, tiling to the wall and then reinstalling the vanity. If no tile under the vanity now, then dont bother.
There are some issues you need to concern yourself with.
What will you have to do to the existing closet flange to make it work with the added height? Any issues with baseboard heat or floor registers? Will there be any problems with raising the existing baseboard moulding. At the doorway, what kind of transition piece do you have now between the bathroom and the existing room? If its a marble saddle, you may have to remove it and replace with another, or something else. You said door height clearance isnt an issue. Will you be replacing the vanity? If not, is there tile under the vanity now? If so, you may want to consider removing the vanity, tiling to the wall and then reinstalling the vanity. If no tile under the vanity now, then dont bother.
#9
Member
Thread Starter
Join Date: Jun 2011
Location: USA
Posts: 53
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Removing Ceramic Tile
@HeresJohnny - I completely gutted the bathroom; vanities, sink, toilet bowl, baseboard moldings gone. The only thing left is the ceramic floor & the tub.
#12
I've seen rotary hammers used...but not the typical pistol grip hammer drill. Rotary hammers can be rented pretty cheap.
#14
As I understand...it won't cut through the metal lath of course...but it will lift and break up all the other stuff...making cutting the lath easier.
#15
Member
Thread Starter
Join Date: Jun 2011
Location: USA
Posts: 53
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Removed!!
OK..so I removed everything...the lathe, mortar & tiles. Now I'm left with a plywood base with a "million" staples from the lathe.
Do I need to remove all of them, can I put a 1/4 plywood over what's there or can I bank them down & thinset right over them?
Thanks for the help!!
Do I need to remove all of them, can I put a 1/4 plywood over what's there or can I bank them down & thinset right over them?
Thanks for the help!!
#16
Hammering them down is fine. Re-screw the subfloor, install new 3/8 or better yet 1/2" underlayment grade ply, (no CDX), Then 1/4" tile backer board into thin set or a membrane such as Ditra.
Get back when you're ready to make more product selections, like the tiles.
Jaz
Get back when you're ready to make more product selections, like the tiles.
Jaz
#17
Member
Thread Starter
Join Date: Jun 2011
Location: USA
Posts: 53
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Many thanks...would that make my floor too high if I add 3/4" to the base that's already there? Just thinking about the 2 door jambs...I can measure later on this evening for clearance. I already have the tiles ready to go.
#18
would that make my floor too high if I add 3/4" to the base that's already there?
You'll want to make the new floor the same height as it was. Otherwise you're gonna have other issues.
Jaz
#19
Member
Thread Starter
Join Date: Jun 2011
Location: USA
Posts: 53
Upvotes: 0
Received 0 Upvotes
on
0 Posts
After measuring out...I picked up 1/2" cement board...the tiles are a little over 1/4"...I laid out a piece of board with a couple of tiles & looks good and at the right height.
I'll let you know how it turns out...
Thanks for all the help
I'll let you know how it turns out...
Thanks for all the help
#22
Member
Don't forget you will have to add a bit of height for the thinset....