How to install drywall on lower half of the wall?

I believed I can use something like the Troy DPH11 Professional Series 11 Foot Drywall & Panel Lift Hoist for ceiling and walls but I don't know how low this tool can hold the drywall for me.
 
Sponsored Links
  #2  
Old 11-21-16, 09:10 AM
P
Group Moderator
Join Date: Mar 2003
Location: NC, USA
Posts: 22,770
Received 487 Votes on 448 Posts
You don't use a lift for attaching drywall to the lower half of walls because... you don't need to lift it. You just stand the sheet up against the wall.
 
  #3  
Old 11-21-16, 09:28 AM
C
Member
Thread Starter
Join Date: Jul 2010
Location: USA
Posts: 937
Received 0 Votes on 0 Posts
I see. So if the floor is concrete, I would stand the drywall right from the concrete floor up until it meets the top or next dry above then. Thank you.
 
  #4  
Old 11-21-16, 09:31 AM
M
Forum Topic Moderator
Join Date: Mar 2005
Location: USA - N.E.Tn
Posts: 47,134
Received 228 Votes on 203 Posts
It's best to leave a 1/2" gap between the bottom of the drywall and the floor. That way the drywall won't wick up any moisture that gets spilled on the floor. You can either use scrap drywall or wood for the spacer when you set the drywall in place.
 
  #5  
Old 11-21-16, 09:52 AM
Handyone's Avatar
Member
Join Date: Aug 2000
Location: U.S.
Posts: 5,451
Received 0 Votes on 0 Posts
Ensure you're laying your drywall horizontally on the walls and not vertically.
Laying it horizontally and staggering the joints makes the wall much stronger.
It's like having a 12' long diagonal wall brace versus 4' only.
 
  #6  
Old 11-21-16, 10:27 AM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Location: USA
Posts: 25,177
Received 497 Votes on 456 Posts
Sheets are hung on the ceiling first, using the lift. The lift is not used for walls, but once the ceiling is hung, the next sheet that goes up usually goes horizontally on the wall, tight to the ceiling. The next sheet goes under that, and you can use a toe lift to raise it tight to the sheet above it. As mentioned, a 1/2" gap under the bottom sheet is standard.
 
  #7  
Old 11-21-16, 10:38 AM
C
Member
Thread Starter
Join Date: Jul 2010
Location: USA
Posts: 937
Received 0 Votes on 0 Posts
Ah, that's what I was looking for. I need a toe lift. My basement is partially done...the bottom panels are the only ones that are not complete yet.
 
  #8  
Old 11-28-16, 06:47 AM
C
Member
Thread Starter
Join Date: Jul 2010
Location: USA
Posts: 937
Received 0 Votes on 0 Posts
As mentioned, a 1/2" gap under the bottom sheet is standard.
Okay, just to confirm, I should leave 1/2" gap between the concrete and the drywall, correct?

Thank you so much!
 
  #9  
Old 11-28-16, 06:52 AM
M
Forum Topic Moderator
Join Date: Mar 2005
Location: USA - N.E.Tn
Posts: 47,134
Received 228 Votes on 203 Posts
Yes, you want a gap so the drywall won't wick up water spilled on the floor. The baseboard will hide the gap. It doesn't have to be a perfect 1/2"
 
Reply
Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread
 
Ask a Question
Question Title:
Description:
Your question will be posted in: