Practical Design

Post Your Project
by: we_roof on 04/13/2011 Views 3142

Budget

$20000

Tools & Materials

  • Fascias
  • EaveHems
  • BBC Flashings Ridge Caps&Drip Edge

Summary

This project was done in 2wks , the frame work is only C- Purlin & Z- Purlin ,Knots , Bolt , Srews Aswell as Hurricane Brackets .It was also insulated with a refelective material called PRODEX before installing Standing Seam Sheets , Guttering & Soffits.